University of Calgary

Highlights

  • This project involved the construction of a highly advanced Level 3 bio-containment lab
  • As part of the design build team, Botting provided specialized mechanical systems including; HEPA filtration of exhaust air, treatment of all sanitary waste leaving the lab and extensive fail safe controls and system backups to maintain containment
  • Construction was carried out quickly and efficiently within an operational medical research facility
  • Design, build, commissioning, as well as Health Canada certification were all achieved within seven months

Contact Us

Suite 107, 3445 114 Avenue SE
Calgary, Alberta, T2Z 0K6

Phone: 403-256-6544
Fax: 403-256-7039

Careers: resumes@botting.ca