Cavendish Farms

Highlights

  • New facility boasts 354,000 SQFT, processing 735 million pounds of potato's annually.
  • Botting installed over 82,000 feet of pipe in a 16 month time frame.
  • Systems consisted of welded stainless steel process drainage, PVC underground sanitary drainage, welded stainless steel process systems, Type L copper domestic water systems, PVC XFR rainwater collection systems and various HVAC sheet metal scopes.
  • At the peak of the project, Botting had over 60 plumbers, 13 welders and six sheet metal workers onsite

Contact Us

Suite 107, 3445 114 Avenue SE
Calgary, Alberta, T2Z 0K6

Phone: 403-256-6544
Fax: 403-256-7039

Careers: resumes@botting.ca